Demolition Contractor in Palo Verde, Palo Alto

Classic south Palo Alto: that is Palo Verde, with 1950s tract houses and Eichlers on flat, regular lots. Owners here either rebuild or remodel hard, and we do the demolition for both.

Tract House and Eichler Teardowns in Palo Verde

Palo Verde, east of Middlefield Road around Louis Road and Palo Verde Elementary, was built out in the 1950s with single-story tract houses and Eichlers. Lots are flat and regular, and most houses sit on slabs. As the houses age, many owners replace them with two-story homes, which makes Palo Verde one of the more active teardown neighborhoods in the south part of the city.

A Palo Verde teardown follows Palo Alto's deconstruction ordinance. Before the application goes in, a city-approved reuse group inventories what can be saved. Once the permit is issued, our crew pulls those items off by hand, and lumber, roofing, drywall and metal each go in their own load. The slab, footings and driveway come out last with equipment.

Excavator on a cleared lot at the edge of pine trees (Palo Alto Demolition Pros)

Kitchen and Bath Tear-Outs in Palo Verde Homes

Not everyone rebuilds. Many Palo Verde owners keep the house and redo the kitchen and bathrooms. These houses usually have original or once-remodeled kitchens and baths with tile, laminate and vinyl. Asbestos is common in older floor tile, mastic and joint compound, so we wait for survey results, and a certified abatement crew clears anything flagged.

Moving plumbing on a slab house means trenching the floor. In Eichlers, the radiant tubing is located first.

Equipment Access on Flat Palo Verde Lots

Flat lots and wide driveways make most Palo Verde jobs straightforward to access. A small excavator can usually reach the backyard through a side yard once a fence section is removed. That keeps foundation removal and pool demolition efficient.

Trees are the main limit. Street trees belong to the city, and backyard oaks may be protected. We set up fencing per the arborist's plan before equipment arrives.

Palo Verde streets are also busy with kids walking and biking to Palo Verde Elementary and to the parks nearby. We stage trucks on the property when we can, avoid moving equipment at bell times, and keep the curb and sidewalk swept so neighbors are not stepping around our debris.

Old tile wall being torn out with a ladder and tools (Palo Alto Demolition Pros)

Pool and Backyard Demolition in Palo Verde

Many Palo Verde backyards have 1950s or 1960s pools that are past their life. Owners remove them to gain yard, to build an ADU or as part of a rebuild. We drain, break out and backfill pools with compaction, and remove old patios and sheds at the same time.

Full pool removal with documented compaction is the better choice if anything will be built over the spot later.

If the pool is close to the house or a property line, we break the shell with smaller tools near the edges so vibration does not crack the neighbor's patio or the foundation you are keeping. The spoil and broken gunite go out through the same side yard, so we protect the path with plywood.

Palo Verde Permits, Utilities and Air District Notice

Development Services at the City of Palo Alto issues the permits. For a full removal, the salvage survey goes in with the application, and the air district (BAAQMD) gets its demolition notice ahead of time. Teardown disconnects are requested from City of Palo Alto Utilities, which serves electric, gas, water and sewer here.

We give you a clear list of who does what and when, so the house is not left without power before the salvage crew needs it.

Demolition Work We Handle in Palo Verde

01

Tract Home and Eichler Teardowns

Full removals with salvage surveys, hand dismantling and sorted recycling, followed by slab and footing removal and a graded lot.

02

Kitchen and Bath Demolition

Kitchens and baths stripped to studs and slab for remodels, with slab trenching where new plumbing runs.

03

Backyard Pool Removal

Pools drained, broken out and backfilled with compaction, along with patios, decks and equipment pads.

04

Garage and Driveway Removal

Attached garage interiors, detached garages and old driveways removed and recycled for rebuilds and ADUs.

Demolition FAQs

Palo Verde Demolition FAQ

How long does a Palo Verde teardown take?

Surveys, permits and utility disconnects take the longest. On site, deconstruction and slab removal of a typical single-story house takes a few weeks.

Can a pool be removed at the same time as the house?

Yes. Combining pool removal with the teardown saves mobilization and lets the whole lot be graded at once.

Which office handles a Palo Verde demolition permit?

Palo Alto's Development Services department. For a full removal, the reuse organization's salvage survey is attached to the application.

Do I need an asbestos survey for a kitchen remodel?

For a house of Palo Verde's age, yes. Flooring, mastic and joint compound are common sources, and positive materials must be abated before demolition.

Concrete building mid-demolition with a debris mound (Palo Alto Demolition Pros)

Demolition quote

Get a Palo Verde Demolition Quote

Tell us what is coming out, the house, a kitchen, a pool or all three. A phone call or email follows within 24 hours.

  • Permits
  • Demolition
  • Haul-off

Request a Demolition Quote

Tell us about the job. We reply within 24 hours.

We will reach out via phone or email within 24 hours.

Get a Demolition Quote