
Lot clearing and rough grading
Palo Alto Lot Clearing and Site Prep
Clearing a lot in Palo Alto is mostly about what you are not allowed to touch. We remove brush, stumps, old hardscape and buried debris, and leave the protected trees and the soil ready for building.
Site Clearing After a Palo Alto Teardown
After a house is deconstructed, the lot still has old landscaping, fences, irrigation, walkways, buried footings and sometimes an old septic tank or oil tank on very old properties. Site clearing removes all of that so the builder starts with a clean pad. We rough grade to the levels on the civil plan and leave the soil ready for the soils engineer to inspect.
On Palo Alto's flat lots in Midtown, Palo Verde and Duveneck/St. Francis, clearing is mostly removing shrubs, small trees that are not protected, hardscape and the remains of the old house. On bigger lots in Old Palo Alto and Crescent Park, the job can include old garden walls, gazebos and buried pool equipment.
We also locate and cap abandoned irrigation, cut back invasive ivy and bamboo that tends to creep across Palo Alto property lines, and pull out old fence posts set in concrete. Small items like these slow down an excavation crew if nobody clears them first.

Tree Protection Rules for Lot Clearing in Palo Alto
Palo Alto's tree ordinance protects many trees, including native oaks, redwoods and designated heritage trees, as well as street trees owned by the city. Removing a protected tree needs a city permit, and work near one has to follow an arborist's protection plan. Fencing goes up before clearing starts and stays until construction is done.
That shapes the clearing plan. We avoid driving or stockpiling inside fenced root zones, hand clear around trunks, and leave stumps of unprotected trees ground below grade only where the arborist allows. Getting this wrong can stop a project, so we take it seriously.
Brush Clearing and Fire Safety in the Palo Alto Foothills
In Palo Alto Hills and Los Altos Hills, lot clearing is partly about wildfire. Much of the foothill area west of Interstate 280 is in a mapped fire hazard severity zone, and the fire authority expects defensible space around structures. Before a rebuild, owners often clear dry brush, dead trees and overgrown slopes.
Hillside clearing has to respect slope stability, creeks and nesting birds. We avoid stripping slopes bare in the rainy season, install erosion control where needed and schedule around nesting season when biologists require it.

Barron Park and Irregular Lots
Barron Park feels more like the county than the city: odd-shaped parcels, streets without sidewalks and Matadero Creek cutting through. Lots there can be overgrown with old fruit trees, sheds and decades of accumulated material. Access may be a narrow gravel drive, so equipment is chosen to fit.
Work near the creek may need additional review from agencies that regulate creeks. We check before any clearing that touches a creek bank.
Old Barron Park lots also turn up surprises: abandoned wells, buried trash from decades ago, old foundations of earlier cottages and occasionally a septic tank from before the area connected to sewer. We probe and pothole when the history suggests it, and we stop and tell you before removing anything that needs its own permit or a specialist.
Rough Grading and Erosion Control Before Construction
Once the lot is clear, rough grading sets the pad levels and drainage directions on the plans. We grade, compact where needed and leave the site ready for the soils engineer's inspection. In Palo Alto, erosion and sediment control is required on construction sites, especially during the rainy season, so we install fiber rolls, inlet protection and stabilized entrances as the plan calls for.
Clearing debris is sorted: green waste goes to composting, wood and concrete to recycling and metal to scrap.
Lot Clearing Scope in Palo Alto
Brush, Shrub and Small Tree Removal
We remove brush, shrubs, unprotected trees and stumps, sending green waste for composting instead of landfill.
Hardscape and Buried Debris Removal
Old walkways, walls, fences, irrigation, footings and buried debris are removed so the builder is not surprised during excavation.
Tree Protection During Lot Clearing
We follow the arborist report, install or respect protective fencing and hand clear inside sensitive zones to protect trees the city requires you to keep.
Rough Grading and Erosion Control
The lot is rough graded to plan levels and erosion controls are installed so the site is ready for inspection and construction.
Lot Clearing: Job Site Photos



Lot Clearing and Site Prep Across Palo Alto
Demolition FAQs
Palo Alto Site Clearing FAQ
Do I need a permit to remove trees when clearing a lot in Palo Alto?
Protected trees, including many native oaks, redwoods and heritage trees, need a city permit to remove. Unprotected trees and brush usually do not. We check the arborist report and the city rules before clearing.
Can you clear brush for defensible space in the foothills?
Yes. We clear dry brush, dead trees and overgrowth on hillside properties in Palo Alto Hills and Los Altos Hills, while watching slope stability and erosion control.
What happens to the green waste?
Brush, branches and stumps go to composting or mulching facilities. Wood, concrete and metal from the lot are separated for recycling.
How long does lot clearing take?
Most residential lots take a few days. Large hillside lots, heavy brush or tree protection requirements can add time.

Demolition quote
Request a Lot Clearing Quote for Your Palo Alto Property
Use the form to tell us the lot's location, what is growing or standing on it and what you plan to build. Within 24 hours we call or email to set up a visit.
- Permits
- Demolition
- Haul-off
